We carried out development and restoration works at Henperch Quarry in Denby Dale near Huddersfield for Orbia ( Wavin ) Limited from September to November 2023.
The works required the removal and relocation of existing stockpiles of soils and subsoils. The restoration of worked out areas of the quarry and the removal of soils and overburden to a new section of the quarry to expose the shales used in the manufacture of clay pipes at the Wavin Hazlehead Works.
The works involved stripping and stockpiling 8000 m3 of topsoil and sub soil and the excavation and filling of over 80000 m3 of overburden from the quarry.