We are currently on site carrying out a bulk earthworks and site preparation for a new filling station with associated services and two industrial units at Whitewalls Drive Colne.
The works commenced in late November 2023 and required a full site strip of existing topsoil which has been stockpiled on site. A full cut and fill exercise to produce the required formation levels for all the development and landscape areas.
The construction areas have been covered with a 300 mm thick platform of imported quarried capping.
The works will be complete by the 19th of January 2024.